Aria Environmental

Treatment

Water and wastewater treatment plant engineering

Small and package treatment plants, disinfection systems, upgrades, and plant abandonment with connection to public sewer.

For condominiums, commercial and agricultural facilities, and small utilities.

Water and wastewater treatment plant engineering

We work on small and mid-size water and wastewater treatment facilities: package plants for residential communities, condominiums, clubs, agricultural and industrial sites, and the systems that support them.

Our work includes capacity analyses, plant upgrades and replacements, screening, filtration and chlorination, chlorine contact time calculations, flow meters, effluent disposal trenches and wells, and power outage contingency plans. We also prepare the operating permit renewals and, when a plant is replaced by a connection to the public sewer, the pump station and abandonment plans.

What we do

  • Package wastewater treatment plant upgrades and replacements
  • Capacity analysis and treatment process evaluation
  • Screening, filtration, disinfection and chlorine contact time
  • Effluent disposal trenches, wells and drain fields
  • Flow meters, generators and power outage contingency plans
  • FDEP operating permits and plant abandonment

Who this is for

Questions we hear

Can you tell us if our treatment plant has enough capacity?

Yes. We compare actual and permitted flows with the capacity of each treatment unit and the effluent disposal system, and recommend the upgrades needed.

Do you design effluent disposal trench expansions?

Yes. We design the trenches, prepare the permit modification and observe construction through certification.

Can our community replace its treatment plant with a sewer connection?

Often, yes. We evaluate the option, design the pump station and force main to the public system and plan the plant abandonment.

Related project experience

Package wastewater treatment plant upgrade

Miami-Dade · Residential community

Package wastewater treatment plant upgrade

Capacity analysis, replacement treatment units with filtration and chlorination, and the DERM and FDEP permitting and certification to put the new plant in service.

TreatmentCapacity analysisDERM / FDEPCertification
Treatment plant screening and power contingency

North Miami · Private

Treatment plant screening and power contingency

A new influent screen box, a flow meter and a power outage contingency plan with emergency generator for an operating wastewater treatment plant.

TreatmentFlow meterContingency plan
Wastewater treatment facility disinfection

Homestead area · Agricultural

Wastewater treatment facility disinfection

Liquid chlorine disinfection, process flow diagrams and groundwater monitoring wells for an existing on-site treatment facility.

TreatmentDisinfectionFDEP

Have a project in mind?

Tell us what you need and we will reply within one business day.

Request a proposal →