
South Miami-Dade · Municipal
Municipal pump station capacity upgrade
Upgrade to 850 GPM for existing and future development, with hydraulic analysis of a force main network shared by more than 25 stations.
Studies & GIS
Hydraulic analysis and modeling, capacity studies, sewer evaluations, engineering reports and utility mapping that owners and regulators can rely on.
For utilities, cities and private systems on the DERM ten-year cycle.

Good decisions about water and sewer systems start with the numbers. We prepare hydraulic analyses and engineering studies that owners, utilities and regulators can rely on.
Our studies include hydraulic modeling of water distribution and force main networks, pump station and force main capacity analyses, fire flow analyses, sanitary sewer evaluation surveys (SSES) and infiltration and inflow (I/I) studies, basis of design and engineering reports, and utility GIS atlases with field verification.
What we do
Who this is for
It is a calculation of how water or wastewater moves through pipes and pumps: flows, pressures, velocities and pump operating points. It tells you if a system has the capacity for existing and future demand.
Yes. We inspect the collection system, review CCTV and test results, and prepare the report and repair recommendations.
Yes. We field-verify assets and prepare GIS atlases and map packages for the owner and the regulators.
Related project experience

South Miami-Dade · Municipal
Upgrade to 850 GPM for existing and future development, with hydraulic analysis of a force main network shared by more than 25 stations.

Miami-Dade · Residential
Performance testing of three self-priming pump stations, a flow meter installation and a sanitary sewer evaluation survey of the private collection system.

South Miami-Dade · Municipal · 2018–2023
Field verification of water and sanitary sewer assets and yearly GIS map packages submitted to DERM for a city system.
Tell us what you need and we will reply within one business day.