North Miami · Private
Condominium pump station and force main
Replaced an on-site wastewater treatment plant with a private pump station and about 1,260 LF of 4- and 6-inch force main tied into the city system.
Pump stations
New private and public stations, upgrades and capacity analysis, designed to the utility standard and the flood criteria.
For property owners, developers, cities and the county utility.

We design new private and public sewage pump stations (lift stations) and upgrade existing ones: capacity increases, pump and control panel replacements, emergency power and full rehabilitation with bypass pumping.
Our design calculations cover design flows and peak factors, wet well sizing and pump cycle, buoyancy, system curves, pump selection and force main hydraulics, including networks where several stations share one force main. Stations are designed to the utility’s standards and to the flood criteria, and we stay through start-up testing and certification.
What we do
Who this is for
They are the same thing. A lift station, or sewage pump station, lifts wastewater from a low point into a force main when gravity flow is not possible.
Yes. We prepare bypass pumping and phasing plans so the station keeps working during construction.
Yes. We prepare the O&M manual and the operating permit package in the format the county requires.
Related project experience

North Miami · Private
Replaced an on-site wastewater treatment plant with a private pump station and about 1,260 LF of 4- and 6-inch force main tied into the city system.

South Miami-Dade · Municipal
Upgrade to 850 GPM for existing and future development, with hydraulic analysis of a force main network shared by more than 25 stations.

Miami-Dade · Residential
Performance testing of three self-priming pump stations, a flow meter installation and a sanitary sewer evaluation survey of the private collection system.